Milford on Sea outdoor switchgear

Case Study

Milford on Sea

33/11kV substation — engineering delivered, power enabled

Complete detailed design across civil, electrical and system studies for Keltbray on SSEN’s transformer intervention, with HMF acting as Principal Designer.

  • 33 / 11kV
  • Hampshire, SO41 0AP
  • Keltbray · SSEN

The Project

Engineering excellence in action

Our multidisciplinary approach ensured coordinated, practical and reliable engineering solutions through every stage of the project.

13MVA, 33/11kV transformers at Milford on Sea were assessed as being in poor condition, with oil leaking into the soil due to the absence of a suitable bund. The works form part of SSEN’s RIIO-ED2 asset replacement programme, targeted for completion during 2024/25.

The scheme improves transformer Health Index from HI5 to HI1 and lifts declared firm capacity from 13.0MVA to 23.8MVA.

Download project PDF

Location

Milford On Sea, Lymington, Hampshire, SO41 0AP

Phase

Engineering design

Partner

Keltbray

End Client

Scottish & Southern Electricity Networks

OEMs

Winder Power Transformers, Morris Line Disconnectors, Brush Circuit Breakers, TE Connectivity Surge Arrestors

Project Facts

At a glance

HI5 to HI1

Transformer Health Index uplift

13.0 to 23.8 MVA

Declared firm capacity increase

RIIO-ED2

Targeted completion 2024/25

Principal Designer

Civil, electrical and system studies

Scope of Works

Associated plant works

  • Removal of existing 2 nos. auxiliary transformers
  • Replace existing isolators with new manual isolators
  • Install new circuit breakers in both transformer feeders
  • Replace protection panels and AVC panels at local and remote ends
  • Replace LVAC board
Installed transformer at Milford
33/11kV Transformer 1 control cabinet

Engineering Delivered

Services on this project

  • Civil Engineering Design
  • Electrical Engineering Design
  • Cable Design
  • Principal Designer Services
  • CDM Support & Compliance
  • Temporary Works Design

Project Highlights

Delivering value through design

Integrated design across civil, electrical and cable disciplines.

Collaborative approach focused on quality and performance.

Supporting a resilient and sustainable energy future.

Key deliverables

  • Civil foundation design for the new equipment
  • Primary and secondary design including SLDs, stage-by-stage SLDs, MCP and protection schematics
  • System studies including earthing, cable design and protection coordination

Key milestone

  • Final set of civil and electrical drawings issued for construction
Milford on Sea substation compound

Challenges

Key engineering challenges

  1. Oil leakage without bunding

    Existing transformers were leaking oil into soil due to the absence of a suitable bund, driving urgent intervention.

  2. Health and capacity together

    The scheme had to improve Health Index from HI5 to HI1 while lifting firm capacity from 13.0MVA to 23.8MVA.

  3. Protection and control refresh

    Protection and AVC panels required replacement at local and remote ends alongside primary plant works.

  4. Multi-OEM interface

    Design integrates Winder Power, Morris Line Disconnectors, Brush Circuit Breakers and TE Connectivity Surge Arrestors.

On Site

Project photography

H-frame and live apparatus
Transformer compound overview
Poles and overhead lines
Bondguard control panel
Substation yard overview
Live equipment and safety cone
Completed pavement works
Switchgear against blue sky

Building a sustainable energy future

Projects like Milford reflect our commitment to engineering excellence, innovation and delivering solutions that empower a net zero future.

Solution

Integrated design leadership

HMF delivered complete detailed design across civil, electrical and system studies, liaising with Keltbray throughout and acting as Principal Designer.

Deliverables include civil foundations, primary and secondary design with SLDs and protection schematics, plus earthing, cable design and protection coordination studies.

Outcome

Safer plant, stronger capacity

The design supports SSEN’s RIIO-ED2 target for 2024/25, with civil and electrical drawings issued for construction.

Milford on Sea gains improved transformer health, proper containment, and nearly doubled firm capacity for the Hampshire distribution network.

Our Services
Contact Us
Monday – Friday 08.00 – 17.00
0333 3356586
[email protected]
About Us

HMF Consultants delivers dependable power engineering and renewable energy consultancy, from grid studies and substation design to coordinated packages and practical support for developers and EPC teams.

Buy on
RTL
Click to Enable