Chickerell 132kV/33kV

Capital replacement of coastal 132/33/11kV plant for SSEN

HMF Consultants completed feasibility and detailed design for Keltbray on SSEN's Chickerell substation capital schemes — replacing ageing outdoor plant at a coastal site and acting as Principal Designer.

  • 132kV / 33kV / 11kV
  • Substation Replacement
  • Weymouth, Dorset
  • Partner: Keltbray

Project Overview

Condition-driven replacement at a coastal grid substation

SSEN identified the poor condition of plant and equipment at Chickerell 132/33/11kV substation. Optioneering recommended a package of capital schemes to improve the Health Index of assets, future-proof the site, and reduce the risk of advanced ageing due to the substation's coastal location.

Scope of capital works:

  • Replacement of the entire outdoor 33kV AIS switchgear
  • Replace 2 x 45/90MVA 132/33kV Grid A1MT & A2MT transformers
  • 2 x 33/0.415kV 1250kVA auxiliary earthing transformers
  • 2 x 33kV neutral earthing resistors
  • Installation of 1 x 90MVA 132/33kV A3MT transformer along with a new third bay
  • Replace 4 x 132kV outdoor dead tank circuit breakers including associated civils
  • Replace 4 x 132kV 2000A/40kA double break disconnector/earthing switches including associated civils
  • Replace the existing LVAC

Location

Off Wessex Roundabout, Weymouth, Dorset, DT4 9XH, England, United Kingdom

Project Phase

Engineering Design

Delivery Partner

Keltbray

End Client

Scottish & Southern Electricity Networks (SSEN)

OEMs used and collaborated with

Siemens, GE, Tironi, Getra Transformers

Download project PDF

Project Facts

Key project metrics

132 / 33 / 11kV site

Multi-voltage capital replacement at Chickerell

3 x 132/33kV transformers

A1MT, A2MT replacement plus new A3MT 90MVA bay

Feasibility + detailed design

Full end-to-end design delivery for Keltbray

Key milestones 2024

Feasibility 14.08.2024 · Detailed design 06.11.2024

Project Highlights

Principal Designer delivery for Keltbray

  • HMF has completed the feasibility design and detailed design
  • Conduct regular design review meetings with SSE / Keltbray
  • Conduct full end-to-end design for Keltbray, leading project coordination as Principal Designer
  • Coordinate all design related to civil feasibility submission and cable design

Key Deliverables

Design packages delivered

  • Designing of elevated 33kV switchroom
  • Designing of transformer bunds of 3 x 132/33kV transformers and their auxiliary equipment
  • MCP of 132kV and 33kV
  • Feasibility design of 33kV cables

Key milestones

  • Feasibility submission: 14.08.2024
  • Expected detailed design submission: 06.11.2024

Engineering Challenges

Key engineering challenges

  1. Coastal accelerated ageing

    Plant condition risk was heightened by the substation's coastal environment, requiring a comprehensive capital replacement package.

  2. Major plant change-out

    Works included full outdoor 33kV AIS replacement, three 132/33kV transformers, four 132kV CBs and four disconnectors with civils.

  3. Elevated switchroom and bunds

    Civil and electrical design had to align for the elevated 33kV switchroom and transformer bunds with auxiliary equipment.

  4. Multi-OEM coordination

    Design integrated Siemens, GE, Tironi and Getra Transformers within one coherent site arrangement.

HMF Solution

Feasibility through detailed design under Principal Designer leadership

HMF completed both feasibility and detailed design, held regular reviews with SSE and Keltbray, and coordinated civil feasibility and cable design as Principal Designer.

Key packages included the elevated 33kV switchroom, transformer bunds for three 132/33kV units, MCP for 132kV and 33kV, and 33kV cable feasibility design.

Outcome & Impact

Future-proofing a coastal SSEN asset

Feasibility was submitted on 14.08.2024, with detailed design expected on 06.11.2024 — giving Keltbray and SSEN a clear path to construction-ready engineering.

The schemes improve asset Health Index, future-proof the site, and reduce coastal ageing risk for the Dorset network.

Our Services
Contact Us
Monday – Friday 08.00 – 17.00
0333 3356586
[email protected]
About Us

HMF Consultants delivers dependable power engineering and renewable energy consultancy, from grid studies and substation design to coordinated packages and practical support for developers and EPC teams.

Buy on
RTL
Click to Enable