Fiddler's Ferry 275kV Substation

Case Study

Fiddler's Ferry 275kV Substation

Detailed electrical design for a 150MW transmission-connected BESS

HMF Consultants delivered detailed electrical design for OCU on SSE Utility Solutions' grid-facing Battery Energy Storage System at the former Fiddler's Ferry estate in Warrington, connecting at 275kV.

  • 275kV
  • Battery Energy Storage
  • Warrington, WA5 2UT
  • Partner: OCU

Project Overview

150MW BESS on a former coal-fired generation site

SSE US (Scottish and Southern Energy – Utility Solutions) is actively pursuing internally developed Battery Energy Storage System (BESS) projects to support low-carbon electricity generation targets.

The Fiddler's Ferry estate in Warrington has a long history of power generation. The coal-fired power station was decommissioned after SSE bought it in the early 2000s. SSE US is developing a 150MW, grid-facing, transmission-connected BESS project on this land.

Location

Warrington, United Kingdom, WA5 2UT

Project Phase

Engineering Design

Delivery Partner

OCU

End Client

SSE Renewables / SSE Utility Solutions

Download project PDF

Project Facts

Key project metrics

150MW grid-facing BESS

Transmission-connected storage on the Fiddler's Ferry estate

275kV connection

Bay connected to the FF-NG Substation

Principal Design Engineering

HMF leading design coordination for OCU with SSE

Expected energisation 2025

Key milestone aligned to programme delivery

Project Highlights

Detailed electrical design for OCU

HMF has conducted the detailed electrical design for OCU and progressed the following packages:

  • Cable System Studies
  • Power System Studies
  • Electrical Secondary Design
  • Electrical Primary Design
  • MEP Design

Apart from the above electrical design, HMF also:

  • Conducts regular design reviews with SSE / OCU
  • Performs the Principal Design Engineering role

Key Deliverables

Connection package scope

  • Design and develop the 275kV SLD, KLD and LVAC schemes for the bay connected to the FF-NG Substation
  • Perform 275kV and 33kV cable study and calculations
  • Complete and submit the 275kV cable route and bonding schematic
  • Develop the earthing design and report for the FF BESS site
  • Design and develop the AIS layout of FF-TX Compound and NG Compound
  • Design and develop the control and protection block diagram of FF-TX Compound and NF Compound

Engineering Challenges

Key engineering challenges

  1. Transmission bay interface

    275kV SLD, KLD and LVAC schemes had to integrate with the bay connected to the FF-NG Substation.

  2. Multi-voltage cable systems

    275kV and 33kV cable studies, calculations, routing and bonding required concurrent analysis.

  3. Compound coordination

    AIS layouts and control/protection diagrams spanned FF-TX, NG and NF compounds.

  4. Parallel design packages

    Cable, power system, primary, secondary and MEP design progressed together under regular SSE/OCU reviews.

HMF Solution

Full electrical design leadership for the BESS connection

HMF delivered detailed electrical design for OCU across cable system studies, power system studies, primary and secondary design, and MEP — while performing the Principal Design Engineering role.

Regular design reviews with SSE and OCU kept the 275kV connection package, earthing design, AIS layouts and protection architecture aligned to programme.

Outcome & Impact

Programme-ready design toward 2025 energisation

The completed deliverables support construction progress on a critical transmission-connected BESS asset, with expected energisation in 2025.

Fiddler's Ferry contributes to UK low-carbon generation by enabling flexible, grid-facing storage on a redeveloped former coal site.

Our Services
Contact Us
Monday – Friday 08.00 – 17.00
0333 3356586
[email protected]
About Us

HMF Consultants delivers dependable power engineering and renewable energy consultancy, from grid studies and substation design to coordinated packages and practical support for developers and EPC teams.

Buy on
RTL
Click to Enable